For patent attorneys, agents and IP analysts
Pulling public patent data is the easy part. NOVA Analyzer’s work is what comes after: purpose-built analysis that interprets the claims, organizes what it finds, and draws the connections between them. Every statement links back to its source.
Coming soon. Leave your email and we’ll tell you the day it opens.
Who we work with
Our clients include a number of Fortune 500 companies and a leading AI developer.
Names withheld under client confidentiality.
See it work
Three patents whose validity was decided in public. NOVA Analyzer worked from the patent documents alone, without the court or Board records, and said what it did not search. Then compare its answer with the record.
For US 10736130, claim 1: find the closest prior art that predates the priority date. Tell me whether any single reference discloses every element of the claim, and if one does, chart claim 1 against it element by element for anticipation under §102. If none does, chart the closest one and say what’s missing. List what your search covered and what it didn’t. Use patent documents only, and don’t look up PTAB or litigation records for this patent.
I found one reference whose text maps to every element of claim 1, but only under one reading of two disputed claim terms. Under the other readings, no single pre-priority patent document I found discloses every element.
Dates and claim reading
Does any single reference disclose every element?
US 2008/0075184 A1 (Texas Instruments; Muharemovic, Shen, Bertrand) was published 2008-03-27, so it is prior art under §102(a)(1). It is not one of the references cited on the face of the ’130 patent.
The answer depends on the reading
Claim 1 against US 2008/0075184 A1 for anticipation under §102. Two elements turn on how the claim is read; select a row for the claim language and the cited text.
Claim-reading issues that control the result
Other references found
What the search covered
What it did not cover
The Board relied on one reference, and my search did not find it. It was also not one of the references I excluded for being cited on the patent.
The trial
References the Board relied on
The Board relied on these parts of Kwak:
What happened to each claim
| Ground | Basis | Claims | Result |
|---|---|---|---|
| 1 | §102, Kwak, using its PCT filing date | 1–5, 7–9, 14, 20 | Shown unpatentable |
| 2 | §102, Kwak, using the provisional’s filing date | 1–5, 7–9, 14, 20 | Not reached (moot) |
| 3 | §103, Kwak | 8, 9 | Shown unpatentable |
| 4 | §103, Kwak, using the provisional’s filing date | 8, 9 | Not reached (moot) |
How the Board’s reading of the claim lines up with my earlier caveats
On all three points, the Board adopted the readings under which my main reference, US 2008/0075184 A1 (Texas Instruments), met every element in my chart.
Kwak compared with my references
Was any Board reference one I excluded as cited on the patent?
No. The 18 patent documents cited on the ’130 patent’s face, which I left out, do not include Kwak (US 10615925 B2), its WO publication, or its provisional. Kwak was missed by my search, not excluded.
Limits
For US 10284526, claim 1: find the closest prior art that predates the priority date. Tell me whether any single reference discloses every element of the claim, and if one does, chart claim 1 against it element by element for anticipation under §102. If none does, chart the closest one and say what’s missing. List what your search covered and what it didn’t. Use patent documents only, and don’t look up PTAB or litigation records for this patent.
I found no single patent document dated before July 24, 2017 that expressly discloses every element of claim 1 of US 10284526 B2 in the claimed arrangement. So there is no anticipation chart; instead I charted the closest reference and list below what it lacks.
Patent
“Efficient SSL/TLS proxy,” inventor Sean Moore. Application 16/039896 was filed July 19, 2018 and claims priority to provisional 62/536254, filed July 24, 2017. I used July 24, 2017 as the cutoff but did not check whether claim 1 is actually entitled to the provisional’s date.
Closest reference: US 2012/0290829 A1 (Altman), “System and Method for Selective Inspection of Encrypted Traffic”
It was published November 15, 2012, so it qualifies under §102(a)(1). The same disclosure issued as US 8959329 B2; EP 2 528 299 A1 is in the same family. Neither it nor any family member is among the ’526 patent’s backward citations.
Element by element
| Element | Disclosure in Altman |
|---|---|
| Preamble | Method for “selective SSL inspection” ([0013], [0030]) |
| 1.a: stored list of identification data with a corresponding action | The inspection appliance (SIA) holds a “rule table 180” of IP addresses and server URLs ([0020]–[0022], [0030]). Partial: no passage says each entry carries its own action. The closest is [0032]: the appliance decides “this aspect” (which side’s plain data to transfer) “according to the selection rules.” |
| 1.b: receiving packets that initiate an encrypted flow | Rules are applied to “each new encrypted connection” ([0031]). TCP SYN and ClientHello are not named. |
| 1.c: identifying flow identification data from those packets | Rules are matched on client IP address ([0020]–[0021], [0031]). The text does not say the address comes from the initiating packets. |
| 1.d: comparing with the list | Decision step 216: “matches at least one selection rule” ([0031], [0014]) |
| 1.e: decrypting each packet on a match | “when detecting an encrypted connection that matches the rule table, the SIA decrypts the connection” ([0014], [0032]) |
| 1.f: performing the corresponding action on each packet | The appliance “provides a copy of the connection plain data” to a separate monitoring center ([0014], [0032]). In some embodiments it sends only one direction’s data. Partial: blocking and copy/log are done by that separate center, and only when a threat is found ([0033]). |
| 1.g: re-encrypting after the action and sending to the destination | The appliance re-encrypts “back-to-back toward the opposite party” ([0032]). Not disclosed: that this happens after the action. FIG. 2 puts re-encryption (step 228) before the transfer (step 232). |
Claim 1 against Altman, the closest reference. The status words are NOVA Analyzer’s. Select a row for the claim language and the cited text.
Other references reviewed: each discloses part of the claim
What the search covered
What it did not cover
The Board found all 20 claims of US 10284526 unpatentable, and the patent’s own claim 1 is now cancelled. The most important point: one of the Board’s references is Altman (US 2012/0290829 A1), the same reference I charted as closest. The Board found that Altman anticipates claim 1, which is the opposite of what I reported.
The trial
The Board’s references and grounds
| Reference | Ground | Claims found unpatentable |
|---|---|---|
| Cisco IronPort AsyncOS 7.1 for Web User Guide, Nov. 2010 (Ex. 1008), a non-patent document | §102 | 1–4, 6–14, 16–20 |
| Same user guide | §103 | 1–20 |
| Altman, US 2012/0290829 A1 (Ex. 1005) | §102 | 1–6, 8–16, 18–20 |
| Altman in view of US 2015/0121449 A1 (Ex. 1006, JPMorgan Chase, “Agent assisted malicious application blocking”) | §103 | 1–6, 8–16, 18–20 |
| Altman in view of the Cisco user guide | §103 | 7, 17 |
The Netronome SSL Inspector overview, which was cited during prosecution, was discussed only under §325(d). The Board held that neither the Cisco guide nor Altman is cumulative of it.
How the Board’s references compare with mine
Were any Board references among the ones I excluded?
No. I excluded patent documents cited on the face of the ’526 patent, together with their family members:
For US 7855988, claim 1: find the closest prior art that predates the priority date. Tell me whether any single reference discloses every element of the claim, and if one does, chart claim 1 against it element by element for anticipation under §102. If none does, chart the closest one and say what’s missing. List what your search covered and what it didn’t. Use patent documents only, and don’t look up PTAB or litigation records for this patent.
I didn’t find any single prior-art reference that discloses every element of claim 1 of US 7855988 B2. So I charted the closest one: US 2002/0022481 A1 (Samsung, published 2002-02-21; granted as US 6912388 B2). It was not cited during prosecution of the ’988 patent.
Priority date used: 2008-07-14
The patent was filed that day as application 12/172639, and the warehouse shows no earlier priority claim or parent application. Because it was filed before the AIA took effect, I applied the pre-AIA §102 rules.
Closest reference: US 2002/0022481 A1
The reference describes small private mobile switching centers (“private MSCs”), each with a call manager, that share subscriber data over a virtual private network (VPN) carried on the public phone network:
That sequence matches the steps in elements 1.a, 1.c, 1.e and 1.f, but not their “DMA” wording. Five things are missing:
Whether items 1–4 limit structure depends on how the DMA terms are construed. I did not apply any construction.
Claim 1 against the closest reference. The status labels summarize NOVA Analyzer’s own list of what matches and what’s missing. Select a row for the claim language and the cited text.
Other references reviewed
What the search covered
What it did not cover
The indexing finished: all four papers loaded with no errors. Below is what the institution decision, the final written decision, the Federal Circuit judgment and mandate, and the review certificate say.
The Board relied on one reference, Flore, and found claim 1 anticipated by it. That is unlike my search, where no single reference disclosed every element. My search never surfaced Flore, and it was not among the references I excluded.
1. What the Board relied on
| Item | What the papers show |
|---|---|
| Trial | IPR2023-00531. Microsoft Corporation and Affirmed Networks, Inc. v. Lemko Corporation |
| Claims challenged | 1, 3–9 and 20 |
| Ground | One ground only: pre-AIA § 102 anticipation by Flore (institution decision pp. 6–7; final written decision pp. 5–6) |
| Reference | Flore, US 2007/0021120 A1, published January 25, 2007 (Ex. 1005). Warehouse data: Qualcomm; inventors Oronzo Flore and Francesco Grilli; filed 2006-07-14; granted as US 8553643 B2; titled “Inter-system handover using legacy interface” |
| Expert testimony | Petitioner: James Proctor (Ex. 1003). Patent Owner: Todor Cooklev (Ex. 2001, Ex. 2021) |
| Other exhibit cited | Petitioner cited Ex. 1006, pp. 13–14, for how a GGSN location register works. This supported the Flore ground and was not a separate ground. The passages I retrieved do not say what Ex. 1006 is. |
How the Board matched claim 1 to Flore (final written decision pp. 23–42):
Claim construction. Patent Owner argued that “DMA” requires distributed call routing and peer-to-peer links between DMA servers. The Board rejected that construction and adopted no other; it said rejecting Patent Owner’s reading was enough to decide the case (final written decision pp. 7–21). The Board also declined to read in two further requirements: that the “communications information” identify devices on home networks or contain HLR data; and that the home DMA register store location-register information.
2. What happened to each claim
| Claims | Outcome |
|---|---|
| 1, 3–6, 8 | Found unpatentable as anticipated by Flore. Patent Owner did not argue claims 3–6 and 8 separately (final written decision pp. 42–43) |
| 7 | Found unpatentable. Patent Owner argued it separately; the Board rejected the arguments (pp. 43–44) |
| 9 | Found unpatentable. Patent Owner argued it separately (pp. 44–45 onward) |
| 20 | Found unpatentable. The Board relied on Flore’s reverse handover, from UTRAN to E-UTRAN (Flore ¶ 53) (pp. 47–48) |
| Final written decision | September 10, 2024 (Paper 31): all claims challenged in the petition held unpatentable (pp. 48–49) |
| Federal Circuit | No. 24-2336: affirmed without opinion under Rule 36 on April 10, 2026; mandate issued May 18, 2026 |
| Certificate | US 7855988 K1, issued September 17, 2026: “Claims 1, 3-9, and 20 are cancelled” |
| Claims not challenged | The review did not cover claim 2, claims 10–19, or claims 21 onward, which include independent claims 22, 33 and 42. The certificate does not mention them. |
The papers also note the related district court case, Lemko Corp. v. Microsoft Corp., No. 3:22-cv-00363 (N.D. Tex.). I did not look at that case’s records.
3. The Board’s reference compared with mine
| Board: Flore (US 2007/0021120 A1) | Mine: US 2002/0022481 A1 (Samsung) | |
|---|---|---|
| Subject | Handover between a 3GPP E-UTRAN and a UTRAN/GPRS network | Roaming between private mobile switching centers over a VPN carried on the public phone network |
| Date | Published 2007-01-25, over a year before the 2008-07-14 filing date | Published 2002-02-21 |
| Result | Board found every element of claims 1, 3–9 and 20 | I charted it as the closest reference and listed five elements it lacked |
| Found by my search? | No. It was not in my 714 search results or in the 315 documents filed before the priority date. When I scored it afterwards against my four claim-1 queries, it ranked 154th of 179 (its grant, US 8553643 B2, ranked 160th). | Yes. It ranked 53rd of 179 on the same measure. |
How the Board’s reasoning bears on the gaps I listed for the Samsung reference:
4. Was any Board reference among the ones I excluded?
No. The nine references cited on the ’988 patent, which I left out, were US 2002/0009060, US 2003/0048766, US 2005/0091392, US 2006/0098661, US 2006/0114934, US 2006/0258358, US 2007/0147598, US 2007/0230352 and US 7054322.
Flore (US 2007/0021120) is not among them, so the examiner never had it during prosecution. It also never came up in my search results. I can’t say whether Ex. 1006 was one of the excluded references, because the retrieved passages don’t identify it. Ex. 1006 is listed in the exhibit list filed in the trial, which is not one of the four indexed papers.
Ask a patent question in plain English. NOVA Analyzer interprets the claims, searches the prior art, and returns a claim chart, the references it ruled out, and the gaps in its own search, with every statement linked to its source.
Built for patent attorneys, agents and IP analysts.
{{ notifyError }}
We’ll only use your email to tell you when NOVA Analyzer opens.
We’ll email {{ notifyEmail }} as soon as NOVA Analyzer opens.